Agentic SOC Summit: The New Standard for Autonomous Defense Register

100% detection.
100% protection.
Zero false positives.


CrowdStrike's unified platform achieved perfect scores in MITRE’s most demanding platform evaluation yet.*

background

Workshop:
Outpacing Cross-Domain Threats with the AI-Native Falcon Platform Using the MITRE ATT&CK® Framework

Workshop:
Outpacing Cross-Domain Threats with the AI-Native Falcon Platform Using the MITRE ATT&CK® Framework

CrowdStrike delivers perfect results against real-world attacks


A true unified platform proven to stop real-world adversaries across endpoint, identity, and cloud.

MITRE chart

CrowdStrike demonstrates the power of a unified platform

100% cross-domain detection


The CrowdStrike Falcon® platform achieved 100% detection of SCATTERED SPIDER and MUSTANG PANDA tradecraft in real time with zero false positives. Every detection included complete technique-level details, providing comprehensive who, what, when, where, how, and why insights.

MITRE chart crowdstrike vs competitors
×
crowdstrike vs competition comparison chart
×

100% real-time protection


MITRE’s most demanding evaluation included its first cloud adversary emulation and cross-domain attacks across endpoint, identity, and cloud. The unified Falcon platform stopped every malicious action with real-time speed and complete accuracy against two real-world adversaries, demonstrating an architectural advantage others lack.

From alert to agentic action in seconds


One case. Complete context. MITRE’s evaluation measured how efficiently platforms unify and present detections. The Falcon platform consolidated all activity into a single, enriched case — powered by agentic AI insights from the Malware Analysis Agent and automated through CrowdStrike Falcon® Fusion SOAR workflows — enabling analysts to resolve threats in seconds and defining the agentic SOC of the future.

A graphic depiction of AI

Inside MITRE’s toughest evaluation yet


Watch the demo to learn how CrowdStrike stops breaches across endpoint, identity and cloud.

5 Things to Know About the MITRE ATT&CK Evaluations: Enterprise 2025

5 Things to Know About the MITRE ATT&CK Evaluations: Enterprise 2025

CrowdStrike delivers AI-powered precision from endpoint to cloud and beyond.

Making sense of MITRE in minutes

Featured Resources

CrowdStrike Achieves 100% Detection and 100% Protection in the Most Demanding MITRE ATT&CK® Enterprise Evaluation to Date

Press Release

CrowdStrike Achieves 100% Detection and 100% Protection in the Most Demanding MITRE ATT&CK® Enterprise Evaluation to Date

CrowdStrike Achieves 100% Detection, 100% Protection, and Zero False Positives in 2025 MITRE ATT&CK® Enterprise Evaluations

Blog

CrowdStrike Achieves 100% Detection, 100% Protection, and Zero False Positives in 2025 MITRE ATT&CK® Enterprise Evaluations

5 Things to Know About the MITRE ATT&CK Evaluations: Enterprise 2025

eBook

5 Things to Know About the MITRE ATT&CK Evaluations: Enterprise 2025

Outpacing Cross-Domain Threats with the AI-Native Falcon Platform Using the MITRE ATT&CK® Framework

Workshop

Outpacing Cross-Domain Threats with the AI-Native Falcon Platform Using the MITRE ATT&CK® Framework

CrowdStrike Endpoint Security Achieves 273% ROI Over Three Years

Blog

CrowdStrike Endpoint Security Achieves 273% ROI Over Three Years

Defeating BLOCKADE SPIDER: How CrowdStrike Stops Cross-Domain Attacks

Blog

Defeating BLOCKADE SPIDER: How CrowdStrike Stops Cross-Domain Attacks

*All detection results reported on this page reflect results from the configuration change run of the Enterprise 2025 Evaluation